Study Material

1900-0700

Routine Shift Duties.

Added 1 pt. Halochlor C to tower #3 basin and circulated.

Changed Halochlor C pump setting for the yard tower from 250 to 320.

Un-plugged Oxykor S1100 pump at 02:30 for remainder of shift. Changed pump setting from 75 to 40.