Power Plant 2pm – 11pm

Blowdown boiler 1.

Warm up boiler 3.

Monitor metasys – adjust/dispatch  as needed.

Plant rounds and readings.

Utility readings.

Work on tower walchems – Tower 3/4 and yard now back on line.

Work on metasys graphics – North tower, generators.

Work on engineering blog.