Energy Center Shift Duties 2300hrs-0700hrs Cori

Plant rounds and readings in the Energy Center. Warmed #3 Boiler, Blew down  #1 Boiler and checked LWCO. Tested boiler water and cooling towers water.  Med gas Manifold readings. Metasys Checks and Cold and/or warm calls.

Added 3 gal. of halochlor  and 1 qt. of defoamer to the Yard Tower.

Added 1 gal. of Halochlor to the #3 Tower.

Added sulfite to Boilers.