Study Material

power plant 0700-1900 Dwight

Warmed and blew down boilers ,checked L.W.C.O on #1 boiler.

test and log water results.

pumped in sulfite in to #1 boiler to bring up to stand by levels 450

Rotate boilers,put #3 as lead.

Put manhole covers back on #2 boiler and started filling added chemicals before filling