The Lowly Engineer
Metasys

5305 Building Radiant

The water supply feeding the radiant system for our 5305 Building has been valved off at the fill valve.  A copper coupling is leaking in the Dr. McMurtrie’s office ( southeast corner of the 2nd floor).  Brandon & Jim investigating options for repair.  As a ‘just in case’ I have commanded Radiant Pumps 1 & 2 off in METASYS.