The Lowly Engineer
Study Material

Power Plant 2pm – 11pm

Put chiller 1 online, started tower pump 2 in override. Stopped chiller 3.

Power bump in canton – RTU 4 offline.

Add salt.

Check and record tower dip slide tests.

Update logs.