The Lowly Engineer
Study Material

Power Plant

Blow down boiler 3 gauge glass, water column, mud drum and LWCO.  Power Plant Rounds Equipment Checked And Logged. Warm Up Stand By Boiler#1. Update AIMS. Utility Readings. Monitor Metasys Page/Dispatch/Adjust/Email As Needed. Add salt. Clean in plant.