    Energy Center Shift Duties 2300hrs-0700hrs Cori

    Plant rounds and readings in the Energy Center. Warmed  #1  Boiler.  Blew down  #3 Boiler and checked LWCO.  Tested boiler & Cooling tower  water and logged.   Med gas Manifold readings.  Metasys Checks and Cold and/or warm calls. Added salt. worked on P.M.’s

  • Study Material

    MER 10

    Winter air taps for CW coils have been installed. Most tubing and fittings have been installed. Will try to finish up Thurs. The CW coils do not have access taps. The pressure gagues will have to be removed and the hose fittings installed in there place. The fittings have been left at each coil.

  • Study Material

    MER 32

    MER AHUS have been set up for winter CW coil drying. Some fittings will have to be removed and a 90 will have to be installed for clearence. Fittings have been left in place for installation.