The Lowly Engineer
  • Study Material

    RHB CT

    Close make-up water vale-open CT drain lines-turn off cond pumps-turn off
    CT fans freq drive-turn off CW pumps freq drives. Will check 11-12-14.

  • Study Material

    Power Plant 0700 – 1500 Dwight

    Warmed and blew down boilers checked L.W.C.O. on #3 boiler

    Test and log bolier water results,finished cleaning #3 cooling tower,

    added ecoklenz to #4 cooling tower,asking Bill Metzger to drain make up and basin

    at shut down tonight.

  • Study Material

    E7042 E.F. 32-9

    Replaced two fan belts serving  the GROSSING STATION & general exhaust needs of AP.  Ordered six replacement belts (A38) from GRAINGER, req. # 8106323