• Study Material

    Power Plant 2pm – 11pm

    Blowdown boiler 1. Warm up boiler 3. Monitor metasys – adjust/dispatch  as needed. Plant rounds and readings. Utility readings. Work on tower walchems – Tower 3/4 and yard now back on line. Work on metasys graphics – North tower, generators. Work…