    Energy Center Shift Duties 1900hrs-0700hrs Cori

    Plant rounds and readings in the Energy Center.

    Warmed #3 Boiler, Blew down #1 Boiler and checked LWCO.

    Tested boiler water and cooling towers water.

    Med gas Manifold readings.

    Metasys Checks and Cold and/or warm calls.

    Helped Bill change filters in Mer 18 & 19.

    worked on P.M.’s.

    Boiler #1  sulfite low Added sulfite to boiler #1.

  • Study Material

    Power Plant 0700-1900 Dwight

    Warmed and blewdown boilers checked L.W.C.O. on #1 boiler

    Installed new flame scanner and amplifier, flame signal is 5.0 v

    pm #3 boiler ran on oil

    Rounds and readings

  • Study Material

    Energy Center Shift Duties 1900hrs-0700hrs Cori

    Plant rounds and readings in the Energy Center. Warmed #3 Boiler, Blew down  #1 Boiler and checked LWCO. Tested boiler water and cooling towers water.  Med gas Manifold readings. Metasys Checks and Cold and/or warm calls.

    Added 2.5 gal of halochlor to Yard Tower.

    Changed Thermostat in room 462.

    worked on P.M.’s.

    Metasys Alarm for SJMH Primary Bulk  Nitrogen Liquid Low.

     

  • Study Material

    Power Plant 7am – 7pm

    Fix surgery chiller indicator(3) on metasys to show correct status.

    Med air and gas readings.

    Plant Rounds and readings.

    Warm up boiler 3.

    While warming up boiler 3 there was a quick and short alarm at the console and the pwc started flashing showing a lockout on boiler 3 and quickly cleared itself. I didn’t have to acknowledge or silence anything at the boiler, it stopped by itself. Reset pwc OK. Note: Boiler never shutdown for this alarm which it normally would do – must have happened too fast.

    Blow down boiler 1.

    Add salt to tanks.

    Finish graphic for Ann Arbor and WMAB Generators. Find it in the Generators tab in the folder named graphics.

    Monitor metasys and adjust / dispatch as needed.

    Work on blog – backup database.

     

  • Study Material

    Energy Center Shift Duties 1900hrs-0700hrs Cori

    Plant rounds and readings in the Energy Center.

    Warmed #3 Boiler, Blew down  #1 Boiler and checked LWCO.

    Tested boiler water and cooling towers water. 

    Med gas Manifold readings.

    Metasys Checks and Cold and/or warm calls.

    Changed Chiller Selection to 2, 3, 1, 4, so we can bring chemicals of yard tower up.

    Added 2 gal. of Halochlor to Yard tower.

    Electrical shut Down for surgery area, resetting equitment after it was completed.

    worked on P.M.’s.